Faculty
 
 


Zhe Zhang, PhD, Associate Professor




mail: zhangzhe@njust.edu.cn

 

Research

  • Seru      Design and Production

  • Production      and Operation Management

  • Resource-Constrained      Project Scheduling

  • Construction      Projects Scheduling

  • Uncertainty      Theory

 

Teaching

  • Operations      Research

  • Forecasting      and Decision

  • Project      management

  • Decision      theory and methods

 

Publications

Referred Journals

 

1.    Zhang Z.*, Liu M., Song X. A bi-level fuzzy random model for multimode resource-constrained project scheduling problem of photovoltaic power plant [J]. Journal of Renewable and Sustainable Energy. 2019, 11: 035502.

2.    Zhang Z.*, Shao L., Yong Yin Y. PSO-based algorithm for solving lot splitting in unbalanced seru production systems [J]. International Journal of Industrial and Systems Engineering. 2019, inpress.

3.    Zhang Z.*, Song X. A bi-level programming model of rough stochastic MRCPSP in large-scale hydropower construction project [J]. International Journal of Applied Decision Sciences. 2019, inpress.

4.    Zhang Z.*, Chen M. A bi-level multi-agent system model for decentralized multi-project scheduling of wind power plants [J]. Journal of Renewable and Sustainable Energy. 2018, 10: 035502.

5.    Zhang Z.*, Zhong X. Time/resource trade-off in the robust optimization of resource-constraint project scheduling problem under uncertainty [J]. Journal of Industrial and Production Engineering. 2018, 35(4): 243-254.

6.    Zhang Z.*, Zhong X. Time-cost trade-off resource-constrained project scheduling problem with stochastic duration and time crashing [J]. International Journal of Applied Decision Sciences. 2018, 11(4): 390-419.

7.    Zhang Z.*, Xu J. Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty [J]. Journal of Industrial and Management Optimization. 2016, 12(2): 565-593.

8.    Zhang Z.*, Liu M., Zhou X., Chen L. A multi-objective DCP model for bi-level resource-constrained project scheduling problems in grounding grid system project under hybrid uncertainty [J]. KSCE Journal of Civil Engineering. 2016, 20(5): 1631-1641.

9.    Zhang Z.*, Xu J., Yang H., Wang Y. Bi-level optimization of resource-constrained multiple project scheduling problems in hydropower station construction under uncertainty, Scientia Iranica Transaction A-Civil Engineering. 2015, 22(3), 650-667.

10.  Zhang Z.*, Xu J. Applying rough random MODM model to resource-constrained project scheduling problem: a case study of pubugou hydropower project in china [J]. KSCE Journal of Civil Engineering, 2014, 18(5): 1279-1291.

 

Referred Conference Proceedings

 

1.    Han X., Zhang Z.*, Yin Y. Reliability analysis for a divisional seru production system with stochastic capacity, Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, Bangkok, Thailand, 2018, pp. 710-714.

2.    Zhang Z.*, Wang Y. A bi-level model with rough coefficients for multi-mode resource-constrained scheduling problems, Proceedings of the 2017 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, 2017, pp. 711-914.

3.    Luo L., Zhang Z.*, Yin Y. Seru loading with worker-operation assignment in single period, Proceedings of the 2016 IEEE International Conference on Industrial Engineering and Engineering Management, Bali, Indonesia, 2016, pp. 1055-1158.

4.    Shao L., Zhang Z.*, Yong YinProduction system performance improvement by assembly line-seru conversion, Proceedings of the 2016 International Conference on Management Science and Engineering Management, Baku, Azerbaijan, 2016, pp. 1165-1180.

5.    Chen M., Zhang Z.* A bid & auction mechanism for resource management in project portfolios, Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore, 2015, pp. 1297-1301.

6.    Zhong X., Zhang Z.* Proactive scheduling procedures for RCPSP with Beta distributed durations and exponential distributed resources, Proceedings of the 2015 International Conference on Management Science and Engineering Management, Karlsruhe, Germany, 2015, pp. 855-867.

7.    Zhang Z.* A MODM bi-level model with fuzzy random coefficients for resource-constrained project scheduling problems, Proceedings of IEEE 2014 Seventh International Joint Conference on Computational Sciences and Optimization, Beijing, 2014, pp. 666-669.

8.    Chen L., Zhang Z.* A two-stage resource-constrained project scheduling model with proactive and reactive strategies under uncertainty, Proceedings of the 2014 International Conference on Management Science and Engineering Management, Portugal, 2014, pp. 1397-1407.

9.    Zhang Z.*, Wang Y. A bi-level model for resource-constrained multiple project scheduling problems, Proceedings of the 2013 IEEE International Conference on Industrial Engineering and Engineering Management, Bangkok, Thailand, 2013, pp. 1297-1301.

10.  Zhang Z.* Applying improved particle swarm optimization algorithm to bi-level linear programming problem with bi-random coefficients, Proceedings of the Fifth International Conference on Management Science and Engineering Management, TaibeiP. R. China, 2011, pp. 147-152.

 

Grants

1.    2018 International Exchanges & Cooperation of Nanjing University of Science and Technology, 2018.01-2018.12 (30,000 CNY)

2.    Natural Science Foundation of China, Grant No. 71401075, 2015.01-2017.12 (220,000 CNY).

3.    Fundamental Research Funds for the Central Universities, Grant No. JGQN1403, 2014.05-2014.04 (30,000 CNY)

4.    Jiangsu Provincial Natural Science Foundation of China, Grant No. BK20130753, 2013.07-2016.06 (200,000 CNY).

5.    Fundamental Research Funds for the Central Universities, Grant No. 30920130132012, 2013.01-2014.12 (30,000 CNY).

 

Administration and Service

Invited Paper Reviewer for:Journal of scheduling, International Journal of Production Research, Omega, Journal of Industrial and Management Optimization, etc.